Installation
BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS: YAW RATE AND ACCELERATION SENSOR: INSTALLATION
1. INSTALL YAW RATE AND ACCELERATION SENSOR
(a) Connect the yaw rate and acceleration sensor connector.
NOTICE:
Make sure that the yaw rate and acceleration sensor connector is connected securely.
(b) Install the yaw rate and acceleration sensor with the 2 bolts.
Torque : 8.5 Nm (87 kgf-cm, 75 in-lbf)
NOTICE:
* Do not damage the yaw rate and acceleration sensor.
* Make sure that the yaw rate and acceleration sensor is installed securely.
* Do not use dropped or damaged parts.
* Keep the contact surfaces of the yaw rate and acceleration sensor and the body free of foreign matter.
* Make sure that the sensor is facing the correct direction.
2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL ASSEMBLY Installation
3. INSTALL SHIFT LOCK CONTROL UNIT ASSEMBLY Installation
4. INSTALL AIR CONDITIONING CONTROL ASSEMBLY Installation
5. INSTALL CONSOLE BOX ASSEMBLY Installation
6. INSTALL BOX BOTTOM MAT Installation
7. INSTALL FRONT NO. 2 CONSOLE BOX INSERT Installation
8. INSTALL NO. 2 CONSOLE BOX MOUNTING BRACKET Installation
9. INSTALL ELECTRICAL KEY OSCILLATOR Installation
10. INSTALL FRONT NO. 1 CONSOLE BOX INSERT Installation
11. INSTALL REAR CONSOLE BOX ASSEMBLY
Installation
12. INSTALL GLOVE COMPARTMENT DOOR Installation
13. INSTALL NO. 2 INSTRUMENT PANEL REGISTER Installation
14. INSTALL NO. 1 SIDE DEFROSTER NOZZLE Installation
15. INSTALL NAVIGATION RECEIVER WITH BRACKET (for Navigation Receiver Type) Installation
16. INSTALL RADIO AND DISPLAY RECEIVER ASSEMBLY WITH BRACKET (for Radio and Display Type) Installation
17. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY Installation
18. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH Installation
19. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation
20. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY Installation
21. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
22. INSTALL REAR NO. 3 FLOOR BOARD Installation
23. INSTALL REAR DECK FLOOR BOX Installation
24. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation
25. PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION
Calibration