Installation
P410 HYBRID TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION
1. INSTALL SHIFT LOCK CONTROL UNIT ASSEMBLY
(a) Install the shift lock control unit assembly with the 3 nuts.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(b) Connect the connector to the shift lock control unit assembly.
2. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation
3. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
5. INSTALL REAR NO. 3 FLOOR BOARD Installation
6. INSTALL REAR DECK FLOOR BOX Installation
7. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation
8. INSPECT SHIFT LEVER
(a) Turn the power switch on (IG).
(b) Check that all available shift positions can be selected moving the shift lever.
HINT
After the shift lever is replaced with a new one, perform the above operation. If this operation is not performed, moving the shift lever may not initially select shift positions.