Spur Gear Unit
Spur Gear Unit
Special tools, testers and auxiliary items required
• Sealant
Removing
• Engine secured the scissor lift platform (VAS 6131 A) and separated from the transmission. Refer to => [ Engine and Transmission, Separating ] Engine and Transmission, Separating or secured to the engine/transmission holder => [ Engine, Securing to Engine and Transmission Holder ] Engine, Securing to Engine and Transmission Holder.
- Remove the left exhaust manifold with catalytic converter. Refer to => [ Left Exhaust Manifold with Catalytic Converter ] Left Exhaust Manifold With Catalytic Converter.
- Remove timing chain lower cover. Refer to => [ Lower Timing Chain Cover ] Lower Timing Chain Cover.
- Remove the hose clamp on the A/C compressor drive dust cap - arrow -.
- Remove the power take-off drive chain. Refer to => [ Power Take-Off Drive Chain ] Power Take-Off Drive Chain.
- Remove bolts - 1 to 6 -.
- Remove the spur gear unit - 1 - and remove the oil pump drive - 2 -.
Installing
• Replace O-ring.
- Replace the shaft seal - 3 - => [ Shaft Seal for the Power Steering Pump
Drive ] Power Take-Off Assembly Overview, and semi-circular seal - 4 - => [ Semi-Circular Ring ] Power Take-Off Assembly Overview in the power steering pump drive if damaged.
- Remove any sealant still on the spur gear unit and cylinder block.
- Clean the sealing surfaces; they must be free of oil and grease.
• Note the expiration date of the sealing compound.
- Cut the tube nozzle at the front marking (nozzle diameter approximately 1.5 mm).
CAUTION!
The lubrication system could be plugged with excess sealant.
• Do not apply sealant bead thicker than indicated.
- Apply sealant bead - arrow - to clean spur gear unit sealing surface as illustrated.
• Sealant bead thickness: 2.0 mm
- Install O-ring - 1 - and secure using some grease.
• Install the spur gear unit within five minutes of applying the sealant.
• Use a hose clamp appropriate for the model.
- The new hose clamp - 1 - must slide through the hole in the guide frame, over the dust cap - 3 - and onto the A/C compressor input shaft - 2 - while the spur gear unit is still removed.
- Install the oil pump drive - 2 -.
- Position the spur gear unit - 1 - onto the drive shaft.
- Turn the gears back and forth and mount the spur gear unit.
- Tighten the bolts => [ Spur Gear Unit, Tightening
Specifications and Sequence ] Power Take-Off Assembly Overview.
- Slide the dust cap - arrow - onto the end of the shaft for the A/C compressor drive spur gear with the hose clamp already installed and secure it.
The rest of the installation is in reverse order of removal, note the following:
- Install the power take-off drive chain. Refer to => [ Power Take-Off Drive Chain ] Power Take-Off Drive Chain.
- Install timing chain lower cover. Refer to => [ Lower Timing Chain Cover ] Lower Timing Chain Cover.
- Install the left exhaust manifold with catalytic converter. Refer to => [ Left Exhaust Manifold with Catalytic Converter ] Left Exhaust Manifold With Catalytic Converter.