Installation
POWER STEERING: 2AZ-FE VANE PUMP:
INSTALLATION
1. INSTALL VANE PUMP ASSEMBLY
(a) Temporarily tighten bolt A to the vane pump assembly.
(b) Install the vane pump assembly with bolt B.
Torque: 37 Nm (377 kgf-cm, 27 ft-lbf)
(c) Using SST and a deep socket wrench (14 mm), tighten bolt A.
SST: 09249-63010
Torque: 26 Nm (264 kgf-cm, 19 ft-lbf)
NOTE: Use a torque wrench with a fulcrum length of 345 mm (13.58 in.).
HINT: This torque value is effective when SST is parallel to the torque wrench.
(d) Connect the connector to the oil pressure switch.
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install the pressure feed tube assembly and a new gasket to the vane pump assembly with the union bolt.
HINT: Make sure that the stopper of the pressure feed tube assembly touches the housing front as shown in the illustration.
(b) Using a wrench (27 mm) to hold the pressure port union, torque the union bolt.
Torque: 52 Nm (525 kgf-cm, 38 ft-lbf)
3. CONNECT OIL RESERVOIR TO PUMP HOSE NO.1
(a) Connect the oil reservoir to pump hose No.1 with the clip.
NOTE: Take care not to spill fluid on the V belt.
4. INSTALL FAN AND GENERATOR V BELT (Installation)
5. INSTALL FRONT FENDER APRON SEAL RH
6. INSTALL FRONT WHEEL
Torque: 103 Nm (1,050 kgf-cm, 76 ft-lbf)
7. BLEED POWER STEERING FLUID (Power Steering System)
8. INSPECT FOR FLUID LEAK