Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





2ZR-FXE STARTING: POWER SWITCH: INSTALLATION

1. INSTALL POWER SWITCH

(a) Engage the 2 claws to install the power switch.





2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY Installation

3. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH Installation

4. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation

5. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY Installation

6. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL

7. INSTALL REAR NO. 3 FLOOR BOARD Installation

8. INSTALL REAR DECK FLOOR BOX Installation

9. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation