Installation
2ZR-FXE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL ECM
(a) Install the ECM with the 2 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(b) Install the 2 wire harness clamps.
(c) Connect the 2 ECM connectors.
(1) Connect the 2 ECM connectors and lower the 2 levers.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
* Make sure that the 2 levers are securely locked.
(2) Install the 2 wire harness clamps.
(d) Install the No. 2 engine room wire with the bolt.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(e) Slide the side cover down and engage the 2 claws to install it.
(f) Slide the engine room wire harness down and engage the 2 claws to install it.
(g) Connect the 3 wire harness connectors.
(h) Install the No. 1 relay block cover.
2. INSTALL INVERTER RESERVE TANK ASSEMBLY
(a) Install the inverter reserve tank assembly with the 2 bolts.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
3. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
4. INSTALL REAR NO. 3 FLOOR BOARD Installation
5. INSTALL REAR DECK FLOOR BOX Installation
6. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation
7. PERFORM INITIALIZATION
HINT
Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) battery terminal.
(a) Perform Initialization when replacing the ECM Installation.