Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





2GR-FE STARTING: STARTER: INSTALLATION

1. INSTALL STARTER ASSEMBLY

(a) Install the starter with the 2 bolts.





Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)

(b) Connect the starter connector.





(c) Install the terminal nut and cover the nut with the cap.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

2. INSTALL INLET NO. 1 AIR CLEANER Installation

3. INSTALL BATTERY Installation

4. INSTALL INLET NO. 2 AIR CLEANER Installation

5. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

(a) Connect the cable to the negative (-) battery terminal.

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

7. INSTALL COOL AIR INTAKE DUCT SEAL Installation