Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





1AR-FE COOLING: THERMOSTAT: INSTALLATION

1. INSTALL THERMOSTAT

(a) Install a new gasket to the thermostat.

(b) Install the thermostat with the jiggle valve facing upward.





HINT
The jiggle valve may be set to within 10° on either side of the prescribed position.

2. INSTALL WATER INLET

(a) Install the water inlet with the 2 nuts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. CONNECT NO. 2 RADIATOR HOSE Installation

4. INSTALL GENERATOR ASSEMBLY Installation

5. INSTALL WIRE HARNESS CLAMP BRACKET Installation

6. INSTALL V-RIBBED BELT

HINT
Installation

7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

8. ADD ENGINE COOLANT Service and Repair

9. INSPECT FOR COOLANT LEAK Replacement

10. INSTALL COOL AIR INTAKE DUCT SEAL Installation

11. INSTALL NO. 1 ENGINE UNDER COVER

12. INSTALL NO. 2 ENGINE UNDER COVER

13. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation