Indicator Circuit
LIGHTING (EXT): LIGHTING SYSTEM: Indicator Circuit
- Indicator Circuit
DESCRIPTION
The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the power switch is turned on (IG). The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
1. CHECK HARNESS AND CONNECTOR (BATTERY - COMBINATION METER ASSEMBLY)
(a) Disconnect the L27 combination meter assembly connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)
(a) Disconnect the A48 headlight leveling ECU assembly connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
3. INSPECT NO. 3 METER CIRCUIT PLATE
(a) Reconnect the L27 combination meter assembly connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- REPLACE NO. 3 METER CIRCUIT PLATE Disassembly
OK -- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Exterior Lighting System