Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Indicator Circuit





LIGHTING (EXT): LIGHTING SYSTEM: Indicator Circuit
- Indicator Circuit

DESCRIPTION

The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the power switch is turned on (IG). The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.

WIRING DIAGRAM





INSPECTION PROCEDURE

PROCEDURE

1. CHECK HARNESS AND CONNECTOR (BATTERY - COMBINATION METER ASSEMBLY)

(a) Disconnect the L27 combination meter assembly connector.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

2. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)

(a) Disconnect the A48 headlight leveling ECU assembly connector.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

3. INSPECT NO. 3 METER CIRCUIT PLATE

(a) Reconnect the L27 combination meter assembly connector.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





NG -- REPLACE NO. 3 METER CIRCUIT PLATE Disassembly

OK -- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Exterior Lighting System