Installation
2ZR-FXE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION
1. INSTALL INTAKE MANIFOLD
(a) Install a new No. 1 intake manifold to head gasket to the intake manifold.
(b) Install the intake manifold with the 2 bolts and 2 nuts.
Torque : 28 Nm (285 kgf-cm, 21 ft-lbf)
(c) Connect the fuel vapor feed hose and ventilation hose.
(d) Install a new O-ring to the engine oil level dipstick guide sub-assembly.
(e) Apply a light coat of engine oil to the O-ring.
(f) Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.
Bolt (A) - Torque : 28 Nm (285 kgf-cm, 21 ft-lbf)
Bolt (B) - Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(g) Install the engine oil level dipstick.
(h) Connect the 2 wire harness clamps and 3 connectors.
2. INSTALL VACUUM SWITCHING VALVE ASSEMBLY Installation
3. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR Installation
4. INSTALL EGR PIPE ASSEMBLY Installation
5. INSTALL THROTTLE BODY ASSEMBLY
(a) Install the throttle body assembly Installation.