Installation





2ZR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY

(a) Install the wire harness clamp bracket with the bolt.





Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)

(b) Temporarily install the generator assembly with the 2 bolts.





(c) Install the generator connector and wire harness clamp.





(d) Install the wire harness to terminal B with the nut and install the terminal cap.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

2. INSTALL V-RIBBED BELT Installation

3. ADJUST V-RIBBED BELT Installation

4. INSPECT V-RIBBED BELT Testing and Inspection

5. INSTALL ENGINE UNDER COVER RH

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL