Installation
2AZ-FXE ENGINE CONTROL SYSTEM: THROTTLE BODY: INSTALLATION
1. INSTALL THROTTLE BODY
(a) Install a new gasket onto the intake manifold.
(b) Connect the purge line hose to the throttle body.
(c) Connect the water by-pass hose to the throttle body.
(d) Connect the No. 2 water by-pass hose to the throttle body.
(e) Install the throttle body and fuel pipe support with the 4 bolts.
Torque : 30 Nm (305 kgf-cm, 22 ft-lbf)
(f) Connect the fuel tube into the clamp.
(g) Connect the throttle position sensor connector.
(h) Connect the wire harness clamp.
2. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
(a) Install the air cleaner filter element onto the air cleaner case.
(b) Insert the hinges, and then install the air cleaner cap sub-assembly with the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(c) Connect the air cleaner cap sub-assembly to the throttle body and unfasten the No. 1 air cleaner hose clamp.
Text in Illustration
NOTICE:
* Match each concave area of the air cleaner hose with the bolt of the throttle body.
* Make sure that the hose clamp is at the correct angle.
(d) Connect the No. 2 ventilation hose to the cylinder head cover.
(e) Connect the purge line hose to the clamp*1.
(f) Connect the 2 purge VSV vacuum hoses*2.
(g) Connect the purge VSV connector*3.
(h) Connect the mass air flow meter connector*4.
3. ADD COOLANT (for Engine) Coolant (for Engine)
4. INSPECT FOR COOLANT LEAK (for Engine) Testing and Inspection
5. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation