Vacuum Reservoir: Testing and Inspection
VACUUM TANK INSPECTION
INSPECT VACUUM TANK
(a) Check that air flows from port A to B.
(b) Check that air does not flow from port B to A.
(c) Plug port B with your finger and apply 53.3 kPa (400 mmHg, 15.75 in.Hg) of vacuum to port A. and check that there is no change in vacuum after 1 minute. If operation is not as specified, replace the vacuum tank.