Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Ignition Cable: Testing and Inspection

Spark Plug Wire Inspection:





- Remove distributor cap without disconnecting high-tension cords.
- Using an ohmmeter, measure the resistance without disconnecting the distributor cap.

Maximum resistance: 25 k ohms per cord

- If the resistance is greater than maximum, check the terminals.
- If necessary, replace the high-tension cord and/ or distributor cap.