Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Test H

PINPOINT TEST H: C1784: EPB MOTOR OUTPUT CIRCUIT SHORT TO GROUND

Tests H1 - H2:






Normal Operation
The EPB 2-way motor receives power from circuit 32-CG19 (WH/VT) or 32-CG19 (YE/VT), depending the direction of the motor revolution. When the EPB is applied, circuit 32-CG19 (WH/VT) is equal to the battery voltage and circuit 32-CG19 (YE/VT)is equal to 0 volts. When the EPB is released, 32-CR19 (YE/VT)is equal to 0 volts and 33-CT19 (YE/VT)is equal to the battery voltage. Otherwise both circuits are at one half of the battery voltage.

Possible Causes
^ circuit 32-CG19 (WH/VT) short to ground
^ circuit 32-CG19 (YE/VT) short to ground
^ EPB module
^ EPB switch
^ EPB actuator

CAUTION: Use the Flex Probe Kit for all test connections to prevent damage to the wiring terminals. Do not use standard multimeter probes.