Air Spring Filling or Refolding
1. Turn air suspension switch OFF.2. Connect Super STAR II Tester to data link connector on front side of RH shock tower.
3. Install battery charger to reduce battery drain.
4. Enter function test to pump appropriate air springs:
a. 212 LF Air Spring.
b. 214 RF Air Spring.
c. 216 LR Air Spring.
d. 218 RR Air Spring.
5. After completion of air spring fill, inspect all air springs for proper inflation.