Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





2UR-FSE FUEL: FUEL PRESSURE PULSATION DAMPER: INSTALLATION

HINT
When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.

1. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY

(a) Apply a light coat of engine oil to the threads and gasket seating surfaces of the 2 fuel pressure pulsation damper assemblies.

(b) Temporarily install each dampers together with 2 new gaskets and the fuel pipe to the fuel pump.





(c) Install the 2 clamp bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)





(d) Using SST, tighten the 2 dampers.

SST : 09612-24014

09617-24011

without SST - Torque : 40 Nm (408 kgf-cm, 30 ft-lbf)

with SST - Torque : 34 Nm (347 kgf-cm, 25 ft-lbf)

HINT
* Use a torque wrench with a fulcrum length of 30 cm (11.8 in.).
* Make sure SST and the torque wrench are connected in a straight line.





(e) Connect the 3 fuel hoses.





(f) Connect the 2 delivery pipe connectors to the delivery pipe.





2. CONNECT NO. 1 FUEL HOSE





(a) Push in the tube connector to the pipe until the tube connector makes a "click" sound.

(b) Push down on the retainer to lock it in place.

NOTICE:
* Check that there is no damage or foreign objects on the connected part of the fuel pipe.
* After connecting, check that the fuel tube connector and the pipe are securely connected by pulling on them.

3. INSTALL INTAKE MANIFOLD Installation

4. CONNECT PCV HOSE Installation

5. INSTALL PURGE VSV Installation

6. INSTALL WATER BY-PASS PIPE HOSE Installation

7. INSTALL NO. 3 COVER SUB-ASSEMBLY

(a) Install the No. 3 cover with the 2 clips.





8. INSTALL ENGINE MOTOR CABLE CLAMP BRACKET Installation

9. CONNECT FLEXIBLE HOSE BRACKET SUB-ASSEMBLY Installation

10. INSTALL INJECTOR DRIVER Installation

11. CONNECT ENGINE WIRE HARNESS Installation

12. CONNECT ECM CONNECTOR Installation

13. CONNECT NO. 2 CONNECTOR HOLDER Installation

14. CONNECT HYBRID VEHICLE CONTROL ECU Installation

15. INSTALL OUTLET ENGINE ROOM ECM DUCT Installation

16. INSTALL ENGINE ROOM ECU COVER Installation

17. INSTALL NO. 5 COVER SUB-ASSEMBLY

(a) Install the No. 5 cover.

18. INSTALL ENGINE COVER SUB-ASSEMBLY RH

(a) Install the engine cover RH with the 4 nuts.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)





19. INSTALL NO. 6 COVER SUB-ASSEMBLY

(a) Install the No. 6 cover.

20. INSTALL ENGINE COVER SUB-ASSEMBLY LH

(a) Install the engine cover LH with the 4 nuts.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)





21. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE Installation

22. INSTALL SKID CONTROL ECU BRACKET Installation

23. CONNECT BRAKE FLUID RESERVOIR Installation

24. CONNECT NO. 3 RELAY BLOCK Installation

25. INSTALL SKID CONTROL ECU Installation

26. CONNECT NO. 1 MOTOR COOLING PIPE Installation

27. INSTALL AIR CLEANER ASSEMBLY RH Installation

28. INSTALL AIR CLEANER ASSEMBLY LH Installation

29. INSTALL THROTTLE BODY ASSEMBLY Installation

30. INSTALL INTAKE AIR CONNECTOR PIPE Installation

31. CONNECT FRAME WIRE Installation

32. CONNECT INLET INVERTER COOLING PIPE Installation

33. CONNECT GENERATOR CABLE Components

34. CONNECT MOTOR CABLE Components

35. INSTALL INVERTER TERMINAL COVER Components

36. INSTALL MOTOR CABLE COVER RH Installation

37. INSTALL INVERTER COVER ASSEMBLY RH Installation

38. INSTALL COWL TOP VENTILATOR LOUVER RH Components

39. INSTALL SERVICE PLUG GRIP

(a) Install the service plug grip Installation.

40. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

41. INSTALL BATTERY SERVICE HOLE COVER LH Installation

42. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire) Installation

43. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY Installation

44. ADD ENGINE COOLANT Service and Repair

45. INSPECT FOR COOLANT LEAK

46. INSPECT FOR FUEL LEAK Fuel System

47. INSTALL NO. 1 ENGINE UNDER COVER Installation

48. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH Installation

49. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH Installation

50. INSTALL NO. 1 AIR CLEANER INLET Installation

51. INSTALL ENGINE ROOM SIDE COVER LH Installation

52. INSTALL ENGINE ROOM SIDE COVER RH Installation

53. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation

54. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

55. CHECK FUNCTION OF THROTTLE BODY On-Vehicle Inspection