Installation
2AZ-FXE ENGINE MECHANICAL: CYLINDER HEAD GASKET: INSTALLATION
1. INSTALL CYLINDER HEAD GASKET
(a) Place a new cylinder head gasket on the cylinder block surface with the Lot No. stamp facing upward.
Text in Illustration
NOTICE:
* Remove any oil from the contact surfaces.
* Be careful of the installation direction.
2. INSTALL CYLINDER HEAD SUB-ASSEMBLY
(a) Place the cylinder head on the cylinder head gasket.
NOTICE:
Place the cylinder head gently in order to avoid damaging the cylinder head gasket.
(b) Install the cylinder head bolts.
NOTICE:
The cylinder head bolts are tightened in 2 successive steps.
(1) Apply a light coat of engine oil to the threads and under the heads of the cylinder head set bolts.
(2) Using several steps, uniformly install and tighten the 10 cylinder head set bolts and plate washers with a 10 mm bi-hexagon wrench in the order shown in the illustration.
Torque : 70 Nm (714 kgf-cm, 52 ft-lbf)
(c) Mark the front of the cylinder head bolts with paint.
Text in Illustration
(d) Further tighten the cylinder head bolts 90° as shown in the illustration.
(e) Check that the paint mark is now at a 90° angle to the front.
3. INSTALL NO. 1 CAMSHAFT BEARING Reassembly
4. INSTALL NO. 2 CAMSHAFT BEARING Reassembly
5. INSTALL CAMSHAFT Reassembly
6. INSTALL NO. 2 CAMSHAFT Reassembly
7. INSTALL NO. 1 CHAIN VIBRATION DAMPER Reassembly
8. INSTALL CHAIN SUB-ASSEMBLY Reassembly
9. INSTALL CHAIN TENSIONER SLIPPER Reassembly
10. INSTALL TIMING CHAIN GUIDE Reassembly
11. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE Reassembly
12. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY Reassembly
13. INSTALL CRANKSHAFT PULLEY Installation
14. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY Reassembly
15. INSTALL OIL PAN SUB-ASSEMBLY Reassembly
16. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY Reassembly
17. INSTALL CRANKSHAFT POSITION SENSOR Reassembly
18. INSTALL IDLER PULLEY SUB-ASSEMBLY Reassembly
19. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY Installation
20. INSTALL NO. 2 MANIFOLD STAY Installation
21. INSTALL MANIFOLD STAY Installation
22. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR Installation
23. INSTALL INTAKE MANIFOLD ASSEMBLY Installation
24. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY Installation
25. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
26. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE Installation
27. INSTALL ENGINE OIL LEVEL DIPSTICK
28. INSTALL SPARK PLUG Installation
29. INSTALL IGNITION COIL ASSEMBLY Installation
30. INSTALL THROTTLE BODY ASSEMBLY Installation
31. INSTALL V-RIBBED BELT Installation
32. INSTALL V-RIBBED BELT TENSIONER COVER SUB-ASSEMBLY Installation
33. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
HINT
See the steps from Remove Engine Stand through Perform Initialization Installation.