Installation
AA80E AUTOMATIC TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION
AA80E AUTOMATIC TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the floor shift assembly with the 4 bolts.
Torque: 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the 4 clamps to the floor shift assembly.
(c) Connect the 2 connectors to the floor shift assembly.
2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Temporarily tighten the floor shift gear shifting rod with the nut.
HINT: The rod is tightened to a torque specification in the "ADJUST SHIFT LEVER POSITION" procedure.
3. ADJUST SHIFT LEVER POSITION Adjustments
4. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR Installation
5. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation
6. CONNECT HEATED OXYGEN SENSOR Installation
7. INSTALL FRONT CENTER FLOOR BRACE Installation
8. INSTALL REAR NO. 1 FLOOR PANEL BRACE Installation
9. INSTALL TAIL EXHAUST PIPE ASSEMBLY Installation
10. INSTALL NO. 2 FLOOR UNDER COVER Installation
11. INSTALL NO. 1 FLOOR UNDER COVER Installation
12. INSTALL NO. 2 CONSOLE BOX DUCT Installation
13. INSTALL CONSOLE BOX Installation
14. INSTALL CONSOLE BOX REGISTER ASSEMBLY Installation
15. INSTALL REAR ASH RECEPTACLE ASSEMBLY Installation
16. INSTALL FRONT ASH RECEPTACLE ASSEMBLY Installation
17. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation
18. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation
19. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation
20. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY Installation
21. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
22. INSPECT SHIFT LEVER POSITION On-Vehicle Inspection
23. INSPECT FOR EXHAUST GAS LEAK