Valve Cover - RH
Valve Cover - RH
RH Valve Cover (View 1 of 2)
RH Valve Cover (View 2 of 2)
Removal
1. Remove the battery and tray. For additional information, refer to Battery, Mounting and Cables Battery and Battery Tray - Exploded View.
2. Remove the RH ignition coils. For additional information, refer to Engine Ignition - 5.4L (4V) Service and Repair.
3. Remove the crankcase ventilation tube.
4. Disconnect the PCV valve electrical connector.
5. Remove the nut and the RH radio interference capacitor.
6. Disconnect the 4 RH fuel injector electrical connectors.
7. Disconnect the fuel rail pressure and temperature sensor electrical connector.
8. Disconnect the Engine Coolant Temperature (ECT) sensor electrical connector.
9. Detach the 3 wiring harness retainers from the RH valve cover studs.
10. Detach the wiring harness pin-type retainer from the rear of the intake manifold.
11. Remove the nut and the A/C tube support bracket.
12. Remove the 7 bolts, 3 stud bolts and RH valve cover.
- Remove and discard the gaskets.
- NOTICE: Do not use metal scrapers, wire brushes, power abrasive discs or other abrasive means to clean the sealing surfaces. These tools cause scratches and gouges which make leak paths. Use a plastic scraping tool to remove all traces of old sealant.
Clean the mating surfaces with silicone gasket remover and metal surface prep. Follow the directions on the packaging.
- Inspect the mating surfaces.
Installation
1. Install new gaskets. Make sure the gaskets are correctly seated on the valve cover.
2. NOTE: If the valve cover is not secured within 4 minutes, the sealant must be removed and the sealing area cleaned with metal surface prep. Allow to dry until there is no sign of wetness, or 4 minutes, whichever is longer. Failure to follow this procedure can result in future oil leakage.
Apply a bead of silicone gasket and sealant in 2 places where the engine front cover meets the cylinder head.
3. Install the RH valve cover, the 7 bolts and 3 stud bolts.
- Tighten in the sequence shown to 10 Nm (89 lb-in).
4. Install the A/C tube support bracket and nut.
- Tighten to 9 Nm (80 lb-in).
5. Attach the wiring harness pin-type retainer to the rear of the intake manifold.
6. Attach the 3 wiring harness retainers to the RH valve cover studs.
7. Connect the ECT sensor electrical connector.
8. Connect the fuel rail pressure and temperature sensor electrical connector.
9. Connect the 4 RH fuel injector electrical connectors.
10. Install the RH radio interference capacitor and the nut.
- Tighten to 10 Nm (89 lb-in).
11. Connect the PCV valve electrical connector.
12. Install the crankcase ventilation tube.
13. Install the RH ignition coils. For additional information, refer to Engine Ignition - 5.4L (4V) Service and Repair.
14. Install the battery and tray. For additional information, refer to Battery, Mounting and Cables Battery and Battery Tray - Exploded View.