Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Test B: All Door Locks Are Inoperative

PINPOINT TEST B: ALL DOOR LOCKS ARE INOPERATIVE


B1-B2:






B3:






Normal Operation
The power lock relays, which are integral to the smart junction box (SJB), receive voltage through circuit 1679 (WH/YE) and ground through circuit 1205 (BK).

Possible Causes
- circuit 1205 (BK) open
- circuit 1679 (WH/YE) open or short to ground
- SJB