SCG3 - Check Solenoid Wire to PCM For Open
- Key OFF.
- Install Breakout Box (leave PCM disconnected).
- Disconnect the connector of the solenoid in question.
- Measure the resistance between the solenoid BOB Test Pin and the terminal at the solenoid harness connector.
- Is the resistance less than 5 ohms?
Yes -- Go to SCG4. SCG4 - Check Solenoid Wire to PCM For Short
No -- Service the solenoid wire to PCM for opens.