Connector Station on Right Central Tube
Connector Station on Right Central Tube
Removing
- Remove the glove compartment.
- Disconnect electrical connectors - 2, 3, 4 and 5 - on the connector station.
- Remove the bolts - arrows - and connector station - 1 -.
- Unclip the corresponding connector base.
• For the exact assignment of the coupling station on the right central tube, refer to the current wiring diagram.
Installing
• Tightening specification, refer to => [ Front Relay Carrier and Fuse Panel Assembly Overview ] Front Relay Carrier and Fuse Panel Assembly Overview.
Install in reverse order of removal, observing the following:
- Install the glove compartment.