Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Left Combination Valve for Secondary Air Injection






Left Combination Valve for Secondary Air Injection

Special tools, testers and auxiliary items required

Hose Clamps Up to 25 mm Diameter (3094)

Removing

All cable ties opened or cut during engine removal must be reinstalled at the same locations during installation.

- Remove the left front wheel.

- Open the quick-release fasteners - 1 -, remove the screws - 2 - and then remove the noise insulation.





- Remove bolts - 1 - and - 5 - at bottom of left secondary air injection combination valve.





The illustration depicts the engine removed from behind.

Ignore items - 2 to 4 -.

- Pull rear engine cover off - arrows -.





- Remove cover - 1 - in engine compartment (left side).





- Clamp off coolant hose - 2 - using Hose Clamps Up to 25 mm Diameter (3094) and disconnect from coolant expansion tank.





- Seal the connection using a plug that fits.

- Remove coolant expansion tank - arrow -.

- Disconnect electrical wire from Engine Coolant Level (ECL) Warning Switch (F66) at bottom on coolant reservoir and set aside coolant reservoir with coolant hose - 1 - connected.

- Remove vacuum hoses - 1 - and - 3 - to brake booster at bulkhead.





Ignore - 1 -.

- Remove bolts - 2 -.





- Remove vacuum hose - 3 - and air guide hose - 4 - from secondary air injection combination valve by pressing release buttons.

- Remove secondary air injection combination valve with connecting pipe.

The illustration depicts the engine removed from behind.

Ignore - 1 - and - 5 -.

Installing

Installation is in reverse order of removal, note the following:

Replace gaskets and O-rings.

Secure all hose connections with hose clamps appropriate for the model.

During installation, all cable ties must be re-installed at the same location.

- Mount front wheel.

- Check coolant level => [ Filling ] Procedures.

Tightening Specifications