Oil Pan Lower Section
Oil Pan Lower Section
Special tools, testers and auxiliary items required
• Drip tray for workshop crane (VAS 6208)
• Old oil collecting and extracting device (V.A.G 1782 )
• Hand drill with plastic brush attachment
• Protective eyewear
• Sealant
Removing
- Drain coolant. Refer to => [ Cooling System, Draining and Filling ] Procedures.
- Bring lock carrier into service position. Refer to => [ Lock Carrier, Moving into Service Position ] Lock Carrier, Moving Into Service Position.
- Remove bolts - arrows - and remove torque support from engine.
- Place drip tray for workshop crane (VAS 6208) under engine.
- Remove front coolant pipe on engine - arrows -.
- Remove nuts - 1 to 4 - for left and right stabilizer mounts.
- Remove left bracket for refrigerant line - arrows -.
- Remove refrigerant line on bracket - arrow -.
- Disconnect electrical connector on the Oil Level Thermal Sensor (G266) - arrow - and free up the electrical wire.
- Place old oil collecting and extracting device ( V.A.G 1782) under engine and drain engine oil.
- Remove oil pan (lower part) - 1 - and pry out carefully.
• There is still a residual amount of oil in lower section of oil pan.
Installing
• Replace seals.
- Using rotating plastic brush, remove any remaining sealant from oil pan (lower section) and at upper section.
CAUTION!
Wear safety glasses.
- Clean sealing surfaces, they must be free of oil and grease.
- Cut tube nozzle at front marking (nozzle dia. approximately 1 mm).
- Apply sealant bead - arrows - on clean sealing surface of lower section of oil pan as shown in illustration.
• Thickness of sealant bead: 1.5 to 2.0 mm.
• Observe the position of the sealant bead at areas indicated with - arrows -.
• The oil pan (lower section) must be installed within 5 minutes after application of sealant.
• Sealant bead must not be thicker than specified, otherwise excess sealant may get into lower section of oil pan and clog strainer in intake tube.
- Position oil pan lower section and tighten all the bolts in a diagonal sequence to 5 Nm.
- Tighten bolts of lower section of oil pan in diagonal sequence to 10 Nm.
The rest of installation is in reverse order of removal, note the following:
- Install stabilizer bar.
- Install front coolant pipe. Refer to => [ Front Coolant Pipe ] Front Coolant Pipe.
- Install lock carrier with attachments. Refer to =>
Radiator Support Radiator Support
- Place torque support on rubber buffer for torque support and tighten bolts - arrows -.
- Install front bumper cover.
- Add engine oil and check oil level. Refer to => [ Oil Level, Checking ] Testing and Inspection.
- Fill with coolant => [ Filling ] Procedures.
- Check headlight adjustment.
Tightening Specifications