Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Turbocharger: Description and Operation






Turbocharger

Various hose connections are secured.

Charge air system must be properly sealed.

Always replace self-locking nuts, seals, gaskets and clamps.

Fill with engine oil before installing the turbocharger oil supply line on the connections.

After installing the turbocharger, let the engine run at idle for approximately 1 minute. This ensures the turbocharger will have an adequate supply of oil.

CAUTION!
Follow the safety precautions when working on the charge air system and turbocharger. Refer to --> [ Safety Precautions ] Safety Precautions.

Observe rules for cleanliness. Refer to --> [ Clean Working Conditions ] Clean Working Conditions.

Always follow these instructions before and during work.