Installation
2ZR-FE ENGINE CONTROL: ECM: INSTALLATION; 2013 MY Corolla [07/2012 -]
1. INSTALL ECM
(a) Install the 2 ECM brackets onto the ECM with the 4 screws.
Torque : 8.8 Nm (90 kgf-cm, 78 in-lbf)
(b) Install the ECM with the 3 bolts.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the 2 ECM connectors.
(1) Connect the 2 ECM connectors and lower the 2 levers.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
* Make sure that the 2 levers are securely locked.
(d) Install the wire harness clamp.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
5. PERFORM INITIALIZATION
Repair Instruction - Initialization.