Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





2GR-FE COOLING: THERMOSTAT: INSTALLATION

1. INSTALL THERMOSTAT

(a) Install a new gasket to the thermostat.





(b) Install the thermostat with the jiggle valve facing up.

HINT
The jiggle valve may be set within 10° on either side of the prescribed position.

2. INSTALL WATER INLET

(a) Install the water inlet with the 2 nuts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation

4. CONNECT NO. 2 RADIATOR HOSE

(a) Connect the No. 2 radiator hose to the water inlet.





5. INSTALL V-RIBBED BELT Installation

6. ADD ENGINE COOLANT Service and Repair

7. INSPECT FOR COOLANT LEAK Testing and Inspection

8. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

9. INSTALL FRONT FENDER APRON RH

10. INSTALL FRONT FENDER LINER RH

11. INSTALL NO. 2 ENGINE UNDER COVER

12. INSTALL NO. 1 ENGINE UNDER COVER

13. INSTALL FRONT WHEEL RH