Installation
POWER DISTRIBUTION: POWER MANAGEMENT CONTROL ECU: INSTALLATION
1. INSTALL POWER MANAGEMENT CONTROL ECU
(a) Engage the 2 claws to install the power management control ECU.
2. INSTALL ECU INTEGRATION BOX
(a) Install the ECU integration box with the 2 nuts and bolt.
Torque : 14 Nm (138 kgf-cm, 10 ft-lbf)
(b) Engage the 3 clamps to connect the wire harness.
(c) Connect each connector.
3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY Installation
4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.