Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





2ZR-FE ENGINE CONTROL: ECM: INSTALLATION

1. INSTALL ECM

(a) Install the 2 ECM brackets onto the ECM with the 4 screws.





Torque : 8.8 Nm (90 kgf-cm, 78 in-lbf)

(b) Install the ECM with the 3 bolts.





Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(c) Connect the 2 ECM connectors.

(1) Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
* Make sure that the 2 levers are securely locked.

(d) Install the wire harness clamp.





2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation

3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation

5. PERFORM INITIALIZATION

Repair Instruction - Initialization.