Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





POWER DISTRIBUTION: POWER MANAGEMENT CONTROL ECU: INSTALLATION

1. INSTALL POWER MANAGEMENT CONTROL ECU

(a) Install the power management control ECU with the 2 nuts in the order shown in the illustration.





Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)

(b) Connect the 4 connectors.

2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY

Installation