Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Power Distribution





POWER DISTRIBUTION: INTEGRATION RELAY: INSTALLATION

1. INSTALL ENGINE ROOM JUNCTION BLOCK ASSEMBLY

(a) Connect the 2 connectors.

(b) Connect the 4 connectors to the engine room relay block assembly.





(c) Engage the 2 claws to install the engine room junction block assembly.

2. INSTALL NO. 1 RELAY BLOCK COVER

(a) Engage the 2 claws to install the No. 1 relay block cover.





3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

4. INSTALL LUGGAGE TRIM SERVICE HOLE COVER Installation