Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Engine Control





2AR-FXE ENGINE CONTROL: INTEGRATION RELAY: INSTALLATION

1. INSTALL NO. 1 INTEGRATION RELAY

(a) Connect the 4 connectors.

(b) Attach the No. 1 integration relay to the engine room relay block.

(c) Connect the connector.

2. INSTALL NO. 1 RELAY BLOCK COVER