Installation
2AR-FXE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL NO. 1 ECM BRACKET
(a) Install the No.1 ECM bracket with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(b) Connect the wire harness clamp.
(c) Install the wire harness and 2 clamps.
(d) Install the nut.
2. INSTALL NO. 1 RELAY BLOCK COVER
3. INSTALL ECM
(a) Install the No.2 ECM brackets to the ECM with the 2 screws.
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
(b) Temporarily install the screw (B).
(c) Install the ECM with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(d) Install the screw (A).
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
(e) Tighten the screw (B).
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
(f) Connect the 2 ECM connectors and lower the 2 levers.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other part.
* Make sure that the 2 levers are securely locked.
(g) Connect the 2 wire harness clamps.
4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
5. INSTALL LUGGAGE TRIM SERVICE HOLE COVER Installation
6. PERFORM INITIALIZATION
Service Precautions