Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation





2GR-FE ENGINE CONTROL: ECM: INSTALLATION

1. INSTALL ECM

(a) Install the 2 brackets to the ECM with the 4 screws.





Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)

(b) Install the ECM with the 3 nuts.





Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(c) Connect the 2 ECM connectors.





NOTICE:
When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other parts.

(1) Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
Make sure that the 2 levers are securely locked.

2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

4. PERFORM INITIALIZATION

HINT
Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) battery terminal.

(a) Perform Vehicle Identification Number (VIN) registration Repair Instruction - Initialization.

(b) Register the ECM communication ID for the immobiliser system when replacing the ECM Repair Instruction - Initialization.

(c) Perform Initialization when replacing the ECM Installation.