Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Removal





2AZ-FXE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: REMOVAL

1. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY Removal

2. SEPARATE BRAKE MASTER CYLINDER RESERVOIR SUB-ASSEMBLY

(a) Remove the 2 bolts and separate the brake master cylinder reservoir sub-assembly.





3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

(a) Disconnect the camshaft timing oil control valve assembly connector.





(b) Remove the bolt and camshaft timing oil control valve assembly.