Installation
INSTRUMENT PANEL: INSTRUMENT PANEL SAFETY PAD: INSTALLATION
1. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
(a) Engage the 5 claws.
(b) Install the 2 bolts [A] and 2 nuts [G].
(c) Install the 2 clamps.
Bolt [A] - Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
2. ADJUST SPIRAL CABLE
3. INSTALL STEERING WHEEL ASSEMBLY
4. INSTALL HORN BUTTON ASSEMBLY
5. CONNECT BATTERY NEGATIVE TERMINAL
6. PERFORM INITIALIZATION
(a) Some systems need initialization when disconnecting the cable from the negative battery terminal Repair Instruction - Initialization.
7. INSPECT STEERING PAD
HINT
Steering Pad.
8. INSPECT SRS WARNING LIGHT
HINT
Diagnosis System.