Installation
2AZ-FE ENGINE MECHANICAL: VALVE CLEARANCE:
INSTALLATION
1. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
(a) Remove any old packing (FIPG) material.
(b) Apply seal packing to the 2 locations shown in the illustration.
Seal packing:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
- Remove any oil from the contact surface.
- Install the cylinder head cover within 5 minutes after applying seal packing.
- Do not start the engine for at least 2 hours after installing the cylinder head cover.
(c) Install the cylinder head cover with the 8 bolts and 2 nuts.
A - Torque: 11 Nm (110 kgf-cm, 8 ft-lbf)
B - Torque: 14 Nm (143 kgf-cm, 10 ft-lbf)
Nut - Torque: 11 Nm (110 kgf-cm, 8 ft-lbf)
2. INSTALL SPARK PLUG
Torque: 19 Nm (194 kgf-cm, 14 ft-lbf)
3. INSTALL FRONT WHEEL RH
4. INSPECT FOR OIL LEAK