Installation
A246E AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH:
COMPONENTS
INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the park/neutral position switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.
(c) Place a new lock plate and tighten the nut.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
(d) Temporarily install the control shaft lever.
(e) Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
(f) Remove the control shaft lever.
(g) Align the groove with the neutral basic line.
(h) Hold the switch in position and tighten the 2 bolts.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
(i) Using a screwdriver, stake the nut with the lock plate.
(j) Install the control shaft lever, washer and nut.
Torque: 13 Nm (130 kgf-cm, 9 ft-lbf)
(k) Connect the park/neutral position switch connector.
2. INSTALL TRANSMISSION CONTROL ASSEMBLY
(a) Temporarily install the control cable to the control shaft lever with the nut.
(b) Install the control cable with the clip to the bracket.
NOTE: Insert the cable securely.
3. INSTALL BATTERY CARRIER
(a) Install the battery carrier with the 4 bolts.
Torque: 13 Nm (132 kgf-cm, 10 ft-lbf)
4. INSTALL BATTERY
5. ADJUST SHIFT LEVER POSITION (Adjustments)
6. INSPECT SHIFT LEVER POSITION (Adjustments)
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Adjustments)