Shifter M/T: Service and Repair
FLOOR SHIFT LEVER ASSEMBLY (MTM)COMPONENTS
REPLACEMENT
1. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY
2. REMOVE INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY CTR
3. REMOVE INSTRUMENT PANEL BOX
4. REMOVE INSTRUMENT PANEL FINISH PANEL LOWER CENTER
5. DISCONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT
a. Remove the clip, washer and disconnect the cable end of the shift cable from the shift lever assembly.
b. Turn the lock and disconnect the shift cable from the shift lever assembly.
c. Pull out the shift cable from the floor.
6. DISCONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SELECT
a. Remove the clip and disconnect the cable end of the select cable from the shift lever assembly.
b. Turn the lock and disconnect the select cable from the shift lever assembly.
c. Pull out the select cable from the floor.
7. REMOVE FLOOR SHIFT LEVER ASSEMBLY
a. Remove the 4 nuts and shift lever assembly.
8. INSTALL FLOOR SHIFT LEVER ASSEMBLY
a. Install the shift lever assembly with the 4 nuts.
Torque: 12 Nm (120 kgf-cm, 9 ft. lbs.)
9. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SELECT
a. Connect the select cable to the shift lever assembly.
NOTICE:
^ The projecting part of the cable outer should face upward when the shift cable is installed.
^ Make sure that after installation the cable outer spring is moved to the place shown in the illustration.
b. Connect the select cable end with the clip to the shift lever assembly.
c. Connect the select cable to the clamp.
10. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT
a. Connect the shift cable with the clip to the shift lever assembly.
NOTICE:
^ The projecting part of the cable outer should face upward when the shift cable is installed.
^ Make sure that after installation the cable outer spring is moved to the place shown in the illustration.
b. Connect the shift cable end as shown in the illustration.
c. Install the washer and clip.
d. Connect the shift cable to the clamp.