Replacement
Starter Assy (1ZZ-FE/2ZZ-GE):
REPLACEMENT
1. DISCONNECT BATTERY NEGATIVE TERMINAL
2. REMOVE ENGINE UNDER COVER RH
3. REMOVE ENGINE UNDER COVER LH
4. REMOVE STARTER ASSEMBLY
a. Disconnect the starter connector.
b. Open the terminal cover.
c. Remove the nut, then remove the starter wire.
d. Remove the 2 bolts, then remove the starter.
5. INSTALL STARTER ASSEMBLY
a. Install the starter assembly with the 2 bolts.
Torque: 37 N.m (378 kgf.cm, 27 ft.lbf)
b. Connect the starter wire with the nut.
Torque: 9.8 N.m (100 kgf.cm, 7 ft.lbf)
c. Close the terminal cover.
d. Connect the starter connector.
6. INSTALL ENGINE UNDER COVER LH
7. INSTALL ENGINE UNDER COVER RH
8. CONNECT BATTERY NEGATIVE TERMINAL
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)