ABS With EBD System
TERMINALS OF ECUTerminals Of Control Module/Pinouts:
1. Terminals of ECU
Terminals Of Control Module/Pinouts - Terminal Inspection:
2. Terminal inspection
Disconnect the connector and measure the voltage or resistance on the wire harness side.
HINT: Voltage cannot be measured with the connector connected to the skid control ECU as the connector is watertight.