Pinout Values and Diagnostic Parameters
TERMINALS OF ECU1. CHECK INTEGRATION RELAY
a. Disconnect the I12 relay connector.
b. Measure the resistance of the wire harness side connector.
Standard :
If the result is not as specified, there may be a malfunction on the wire harness side.
c. Reconnect the I12 relay connector.
d. Measure the voltage between each terminal and body ground.
Standard:
If the result is not as specified, the integration relay may have a malfunction.
2. CHECK INSTRUMENT PANEL J/B (INTEGRATION RELAY)
a. Inspect the ID, IF, IH and IJ J/B connectors.
b. Measure the resistance of the wire harness side connectors.
Standard:
If the result is not as specified, there may be a malfunction on the wire harness side.
c. Reconnect the connectors.
d. Measure the voltage of the connectors.
Standard:
If the result is not as specified, the integration relay or instrument panel J/B may have a malfunction.