Component Tests
INSPECTION1. INSPECT SLIDING ROOF CONTROL SWITCH
If continuity is not as specified, replace the switch.
2. INSPECT SLIDING ROOF MOTOR WITH ECU CIRCUIT
Disconnect the connector from the relay and switch and inspect the connector on the wire harness side, as shown in the table.
If the circuit is as specified, replace the motor with ECU.
3. INSPECT CIRCUIT BREAKER OPERATION
a. With the sliding roof in the fully opened position, hold the sliding roof switch in "OPEN" position and check that is a circuit breaker operation noise is heard within 10 to 60 seconds.
b. With the sliding roof in fully opened position, hold the sliding roof switch in "TILT UP" position and check that the sliding roof begins to close within 60 seconds.
If operation is not as specified, replace the motor.