Inspection
M/T And 3 A/T - ECM - Connector View:
M/T And 3 A/T - ECM - Pin-outs (Part 1):
M/T And 3 A/T - ECM - Pin-outs (Part 2):
4A/T - ECM - Connector View:
4A/T - ECM - Pin-outs (Part 1):
4A/T - ECM - Pin-outs (Part 2):
INSPECTION
1. REMOVE ECM
a. Remove the finish lower center panel.
b. Remove the 3 bolts and disconnect the ECM.
c. Disconnect the 3 (M/T and 3 A/T) or 4 (4 A/T) ECM connectors.
d. Disconnect the 5 connectors from connectors on bracket.
e. Disconnect the heated oxygen sensor (bank 1 sensor 2) connector.
2. INSPECT ECM
3. REINSTALL ECM
a. Connect the 3 (M/T and 3 A/T) or 4 (4 A/T) ECM connectors.
b. Connect the 5 connectors from connectors on bracket.
c. Connect the heated oxygen sensor (bank 1 sensor 2) connector.
d. Connect the ECM and install the 3 bolts.
e. Install the finish lower center panel.