Component Tests and General Diagnostics
IACV CONTROL VSV (FOR ACIS) INSPECTIONIACV Control VSV, Components For Removal:
1. REMOVE V-BANK COVER AND EMISSION CONTROL VALVE SET
2. REMOVE VSV
- Disconnect the 2 vacuum hoses from the VSV.
- Remove the screw and VSV.
3. INSPECT VSV
A. Inspect VSV for open circuit
- Using an ohmmeter, check that there is continuity between each terminal.
Resistance: At 20°C (68°F): 33 - 39 Ohms
- If there is no continuity, replace the VSV.
B. Inspect VSV for ground
- Using an ohmmeter, check that there is no continuity between each terminal and the body.
- If there is continuity, replace the VSV.
C. Inspect VSV operation
- Check that air flows from port E to the filter.
- Apply battery positive voltage across the terminals.
- Check that air flows from port E to port F.
- If operation is not as specified, replace the VSV.
4. REINSTALL VSV
- Install the VSV with the screw.
- Connect the 2 vacuum to the VSV.
5. REINSTALL EMISSION CONTROL VALVE SET
6. REINSTALL V-BANK COVER