Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Fuel Cut RPM Inspection

FUEL CUT RPM INSPECTION
1. ALLOW THE ENGINE TO WARM UP TO NORMAL OPERATING TEMPERATURE.




2. CONNECT TACHOMETER TO ENGINE.

3. INSPECT FUEL CUTOFF OPERATION.
- Increase the engine speed to at least 2,500 rpm.



- Check for injector operating noise.
- Check that when the throttle lever is released, injector operation noise stops momentarily and then resumes.
HINT: Check with the A/C OFF.

Fuel return speed: 1,000 - 1,500 rpm

4. DISCONNECT TACHOMETER.