Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Transaxle Installation




1. INSTALL TRANSAXLE TO ENGINE
a. Align the input shaft spline with the clutch disc and install the transaxle to the engine.
b. Torque the bolts.

Torque:
Bolt A 64 N-m (650 kgf-cm, 47 ft-lbf)
Bolt B 46 N-m (470 kgf-cm, 34 ft-lbf)




2. INSTALL REAR END PLATE
Install the rear end plate and torque the 4 bolts.

Torque: 9.3 N-m (96 kgf-cm, 82 in-lbf)




3. REMOVE STIFFENER PLATE
Install the stiffener plate with the 3 bolts.

Torque: 37 N-m (380 kgf-cm, 27 ft-lbf)




4. INSTALL ENGINE LH MOUNTING SET BOLTS
Raise the engine left side and install the 3 set bolts.

Torque: 64 N-m (660 kgf-cm, 47 ft-lbf)




5. INSTALL SUSPENSION CROSSMEMBER
a. Install the suspension crossmember in place, then install and tighten the 4 bolts.

Torque: 113 N-m (1,160 kgf-cm, 83 ft-lbf)




b. Install the ABS speed sensor bracket to the suspension crossmember.




c. Install the suspension arm with the bolt and nut to the rear axle hub.

Torque: 103 N-m (1,050 kgf-cm, 76 ft-lbf)




d. Install the lower arm with the bolt to the suspension crossmember.

Torque: 132 N-m (1,350 kgf-cm, 98 ft-lbf)




6. INSTALL ENGINE REAR MOUNTING

Torque:
Transaxle side: 77 N-m (790 kgf-cm, 57 ft-lbf)
Crossmember side: 64 N-m (650 kgf-cm, 47 ft-lbf)
Through bolt: 87 N-m (890 kgf-cm, 64 ft-lbf)




7. INSTALL CLUTCH RELEASE CYLINDER
Install the release cylinder and torque the 2 bolts.

Torque: 12 N-m (120 kgf-cm, 9 ft-lbf)




8. INSTALL ENGINE FRONT MOUNTING
Torque:
Transaxle side: 77 N-m (790 kgf-cm, 57 ft-lbf)
Body side: 73 N-m (740 kgf-cm, 54 ft-lbf)
Through bolt: 96 N-m (980 kgf-cm, 71 ft-lbf)




9. REMOVE ENGINE SUPPORT FIXTURE




10. INSTALL FRONT EXHAUST PIPE
a. Install 2 new gaskets and the front exhaust pipe.
b. Install the 4 bolts.
c. Torque the "A" bolts.

Torque: 62 N-m (630 kgf-cm, 46 ft-lbf)




d. Install and torque the 3 nuts.

Torque: 62 N-m (630 kgf-cm, 46 ft-lbf)




11. CONNECT CONTROL CABLES
a. Install the 2 retainers to the cables.
b. Connect the cables to the linkage with the 2 washers and clips.




12. INSTALL LH AND RH DRIVE SHAFTS
13. FILL TRANSAXLE WITH GEAR OIL

Recommended oil
Oil grade:
API GL-3, GL-4 or GL-5
Viscosity:
SAE 75W - 90 or 80W - 90
Above - 18 °C (0 °F) SAE 90
Below - 18 °C (0 °F) SAE 80 W
Standard Type
Capacity: 4.2 liters (4.4 US qts, 3.6 Imp. qts)
Viscous Coupling LSD Type
Capacity: 3.9 liters (4.1 US qts, 3.4 Imp. qts)

14. INSTALL UNDER COVER
Install the under cover and 5 bolts.
15. INSTALL REAR WHEELS AND LOWER VEHICLE




16. CONNECT VEHICLE SPEED SENSOR CONNECTOR




17. CONNECT BACK-UP LIGHT SWITCH CONNECTOR AND GROUND CABLE




18. INSTALL STARTER
a. Install the starter.
b. Install and torque the 2 bolts.

Torque: 39 N-m (400 kgf-cm, 29 ft-lbf)

c. Connect the connector and wire to the starter.




19. INSTALL LH ENGINE MOUNTING STAY
Install the mounting stay with the 2 bolts.

Torque:
Body side: 73 N-m (740 kgf-cm, 54 ft-lbf)
Transaxle side: 25 N-m (250 kgf-cm, 18 ft-lbf)




20. INSTALL AIR CLEANER HOUSING ASSEMBLY WITH AIR HOSE




21. INSTALL STRUT BAR
Install the strut bar with the 2 bolts and nuts.

Torque:
Bolt 73 N-m (740 kgf-cm, 54 ft-lbf)
Nut 64 N-m (650 kgf-cm, 47 ft-lbf)

22. CONNECT NEGATIVE (-) TERMINAL CABLE TO BATTERY
23. INSPECT REAR WHEEL ALIGNMENT
24. PERFORM ROAD TEST
Check for abnormal noises and smooth shifting.