Air Flow Meter/Sensor: Testing and Inspection
ON-VEHICLE INSPECTION:- INSPECT RESISTANCE OF VOLUME AIR FLOW (VAF) METER.
- Disconnect the VAF meter connector.
- Using an ohmmeter, measure the resistance between each terminal.
- If the resistance is not as specified, replace the VAF meter.
- Reconnect the VAF meter connector.
OFF-VEHICLE INSPECTION
- INSPECT VAF METER.
- Using an ohmmeter, measure the resistance between terminals VS and E2 by moving the measuring plate.
Resistance (VS - E2)
At fully closed 200 - 600 Ohms
At fully open 20 - 1,200 Ohms
HINT: Resistance will change in a wave pattern as the measuring plate slowly opens.
- If the resistance is not as specified, replace the VAF meter.
VAF METER CIRCUIT