Park/Neutral Position Switch Circuit
CIRCUIT DESCRIPTIONThe PNP switch detects the shift lever position and sends signals to ECM.
The ECM receives signals (R, NSW, 2 and L) from the PNP switch. When the signal is not sent to the ECM from the Neutral start switch, the ECM judges that the shift lever is in the D position.
PNP Circuit Diagnostic Chart:
DIAGNOSTIC CHART
PNP Switch Circuit:
WIRING DIAGRAM
PNP Circuit Inspection Procedure:
INSPECTION PROCEDURE